Designing an Effective Failure Analysis Plan Before You Touch the Hardware
Failure analysis often begins with urgency: a failed part, a missed shipment, or pressure to identify fault quickly. In that environment, it’s tempting to move directly into testing or teardown. However, starting without a defined analysis plan frequently leads to wasted samples, inconclusive results, or misleading conclusions. A well-designed failure analysis plan aligns objectives, techniques, …